Título: Principais itens de impacto no planejamento de obra na região de Goiânia
Título(s) alternativo(s): Itens de impacto no planejamento e suas consequências
Autor(es): Abreu, João Marcelo Batista
Primeiro Orientador: Sakai, Erika
metadata.dc.contributor.referee1: Rodrigues, Priscilla Borges de Freitas
metadata.dc.contributor.referee2: Gama Junior, Antônio Claret de Almeida
Resumo: Os principais itens de impacto no planejamento de obras foram o foco esse estudo, que foi realizado através de uma vasta revisão bibliográfica feita com o intuito de recolher dados sobre os principais objetivos do trabalho, sendo eles levantar os principais itens que impactam no planejamento de obras, demostrar o tempo gasto para elaboração do planejamento, e as consequências que uma má gestão desse tempo pode causar em obras existentes. Através de um questionário elaborado na plataforma do google forms, foram entrevistados 43 profissionais da engenharia civil afim de recolher um maior número de dados possíveis para chegar aos resultados e discussões sobre o assunto. As análises dos dados indicaram que 100% dos entrevistados consideram o planejamento uma ferramenta de extrema importância para se obter sucesso, a gestão do tempo deve ser bastante valorizada e bem elaborada entre todas as partes do processo principalmente na área de viabilidade financeira, técnica e executiva, pois é através dela que será possível prever, falhas, inadequações e mudanças que podem ser facilmente corrigidas antes do final do planejamento. Foi possível portanto identificar os itens que impactam em um planejamento e suas consequências.
Abstract: The main items impacting the planning of works were the focus of this study, which was carried out through a vast bibliographical review carried out in order to collect data on the main objectives of the work, as they raise the main items that impact the planning of works , demonstrate the time spent to prepare the planning, and the consequences that a poor management of that time can cause in existing works. Through a questionnaire prepared on the google platform, 43 civil engineering professionals were interviewed in order to collect as much data as possible to arrive at the results and discussions on the subject. Data analysis indicated that 100% of respondents consider planning an extremely important tool to achieve success, time management should be highly valued and well-designed between all parts of the process, especially in the area of financial, technical and executive feasibility , as it is through it that it will be possible to predict failures, inadequacies and changes that can be easily corrected before the end of the planning. It was therefore possible to identify the items that impact planning and its consequences.
Palavras-chave: Planejamento
Gestão do tempo
CNPq: CNPQ::ENGENHARIAS
Idioma: por
País: Brasil
Editor: Pontifícia Universidade Católica de Goiás
Sigla da Instituição: PUC Goiás
metadata.dc.publisher.department: Escola Politécnica
Tipo de Acesso: Acesso Aberto
URI: https://repositorio.pucgoias.edu.br/jspui/handle/123456789/3507
Data do documento: 10-Dez-2021
Aparece nas coleções:TCC Engenharia Civil

Arquivos associados a este item:
Arquivo TamanhoFormato 
PRICIPAIS ITENS DE IMPACTO NO PLANEJAMENTO DE OBRA NA REGIÃO DE GOIANIA.pdf684,29 kBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.

Ferramentas do administrador